{"page":{"id":304,"title":"Cancel or Change an Order","handle":"cancel-change-order","url":"https://mugmellow.shop/cancel-change-order/","body_html":"<p class=\"policy-updated\">Last updated: <time datetime=\"2026-10-31\">October 31, 2026</time></p>\n<p>Mistakes happen most often in the first hour after checkout: a name spelt the way it sounds rather than the way it is written, a 15 oz chosen when you meant 11 oz, last year&#8217;s address still saved in the browser. This page explains how to cancel a Mug Mellow order or change it, how long you have, what can and cannot be changed, and what happens to your money. Because every mug is printed for one person, the window is short: 24 hours from the moment you place the order.</p>\n<section class=\"policy-summary\">\n<h2>Changing your mind in time</h2>\n<ul>\n<li><strong>Window:</strong> 24 hours after you place the order.</li>\n<li><strong>What you can change:</strong> the name, date or note in your Order notes, the photo, the size, the colour, the design, the quantity and the shipping address.</li>\n<li><strong>Cancelling:</strong> free within 24 hours, with a full refund within 7 days of the cancellation being confirmed.</li>\n<li><strong>How:</strong> email <a href=\"mailto:support@mugmellow.shop\">support@mugmellow.shop</a> with your order number and the change.</li>\n<li><strong>After 24 hours:</strong> the order may already be printing; you can still return it within 60 days of delivery with a free label.</li>\n</ul>\n</section>\n<h2>1. Why the window is 24 hours</h2>\n<p>Most shops can cancel an order up until the parcel leaves the building, because the item on the shelf is the same for everyone. Ours is not. Once your Order notes have been set into the design and the mug has been printed, it carries a name that belongs to one person. Processing takes 1-3 business days, and printing can begin early in that period. Twenty-four hours gives you a real chance to reread your order with fresh eyes while making sure everyone&#8217;s mugs leave on time.</p>\n<h2>2. How to ask for a change or cancellation</h2>\n<ol>\n<li>Find your order number. It is in the subject line of the order confirmation email.</li>\n<li>Email <a href=\"mailto:support@mugmellow.shop\">support@mugmellow.shop</a> from the address you used at checkout, with the subject line &#8220;Change order&#8221; or &#8220;Cancel order&#8221; and the order number.</li>\n<li>Write the change exactly as it should be. For a name, type it in full, with the capitals and spacing you want printed.</li>\n<li>Wait for our confirmation email. A change is only final when we have confirmed it in writing.</li>\n</ol>\n<p>We reply within 24 hours on business days. The time that counts for the 24-hour window is the time your email reaches us, not the time we reply, so send your request as soon as you notice.</p>\n<h3>2.1 Using the ticket page</h3>\n<p>If you prefer a structured form of email, our <a href=\"/submit-ticket/\">Submit a Ticket</a> page has a pre-filled subject for order changes. It reaches the same inbox.</p>\n<h2>3. What can be changed</h2>\n<table>\n<caption>Changes within 24 hours of ordering</caption>\n<thead>\n<tr>\n<th scope=\"col\">Change</th>\n<th scope=\"col\">Possible within 24 hours?</th>\n<th scope=\"col\">Cost</th>\n<th scope=\"col\">What to send us</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Spelling of a name or wording in Order notes</td>\n<td>Yes</td>\n<td>Free</td>\n<td>The corrected text exactly as it should be printed</td>\n</tr>\n<tr>\n<td>Photo for a photo mug, pet portrait or photo tumbler</td>\n<td>Yes</td>\n<td>Free</td>\n<td>The new photo as an attachment</td>\n</tr>\n<tr>\n<td>Size (11 oz to 15 oz, 20 oz to 30 oz)</td>\n<td>Yes</td>\n<td>Price difference, up or down</td>\n<td>The new size</td>\n</tr>\n<tr>\n<td>Colour of a two-tone mug, travel mug, tumbler or kids cup</td>\n<td>Yes</td>\n<td>Free</td>\n<td>The new colour</td>\n</tr>\n<tr>\n<td>Design (for example name mug to monogram mug)</td>\n<td>Yes</td>\n<td>Price difference, up or down</td>\n<td>The new design and its personalisation</td>\n</tr>\n<tr>\n<td>Quantity (add or remove mugs)</td>\n<td>Yes</td>\n<td>Price of added mugs, or refund of removed mugs</td>\n<td>Which items to add or remove</td>\n</tr>\n<tr>\n<td>Shipping address</td>\n<td>Yes, within US, Canada, Australia and New Zealand</td>\n<td>Free</td>\n<td>The full new address</td>\n</tr>\n<tr>\n<td>Cancel the whole order</td>\n<td>Yes</td>\n<td>Free, full refund</td>\n<td>The order number and &#8220;please cancel&#8221;</td>\n</tr>\n</tbody>\n</table>\n<h3>3.1 When a change costs more or less</h3>\n<p>If the change increases the price, for example moving a family names mug from 11 oz to 15 oz, we send you a simple way to pay the difference before the order is printed. If it lowers the price, we refund the difference within 7 days of confirming the change.</p>\n<h3>3.2 Adding a different item</h3>\n<p>To add something new, such as a matching kids cup for a sibling, it is often quickest to place a second order. Mention the first order number in the Order notes and we will try to pack both together. Shipping is free on both.</p>\n<h2>4. Cancelling an order</h2>\n<p>Within 24 hours of ordering, you can cancel any order, in whole or in part, for a full refund. Partial cancellations work item by item: cancel two of the five teacher mugs in a team order and the other three continue as normal.</p>\n<p>The refund goes to your original payment method within 7 days of our confirming the cancellation. If you prefer store credit, say so in your email; store credit never expires. The money side is explained in full on our <a href=\"/refund-policy/\">Refund Policy</a> page.</p>\n<h2>5. After the 24-hour window</h2>\n<p>After 24 hours, your order may already be printed, checked or packed, so we cannot promise to change or cancel it. Write to us anyway. If it has not reached production yet, we will do our best. If it has, you still have every option our <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges Policy</a> gives you: once the mug arrives, you can return it within 60 days of delivery for any reason, with a free return label, and either get your money back or order the corrected version.</p>\n<h3>5.1 Address changes after shipping</h3>\n<p>Once a parcel has left us, we may not be able to redirect it. Some carriers let the recipient adjust delivery through their own tracking page; check the link in your shipping email. If the parcel comes back to us as undeliverable, we will contact you to arrange a reshipment or a refund.</p>\n<h2>6. Common changes, with examples</h2>\n<ul>\n<li><strong>A spelling slip:</strong> a customer ordered a name mug for &#8220;Katherine&#8221; and realised three hours later that her aunt spells it &#8220;Catherine&#8221;. One email, the correction confirmed, the mug printed with the right name.</li>\n<li><strong>A bigger mug for a longer list:</strong> a grandma mug with seven names was moved from 11 oz to 15 oz, and the difference was paid before printing.</li>\n<li><strong>A photo swap:</strong> a pet portrait order first had a blurry photo of Biscuit the golden retriever; a sharper picture sent the same evening replaced it.</li>\n<li><strong>A new address:</strong> a family Christmas mug was redirected to a sister&#8217;s address in Auckland instead of the buyer&#8217;s home.</li>\n<li><strong>A colour switch:</strong> a two-tone teacher mug was changed from Red to Navy to match the school&#8217;s colours.</li>\n</ul>\n<h2>7. Getting it right the first time</h2>\n<p>A few habits prevent most change requests:</p>\n<ul>\n<li>Copy names from a message or contact card rather than typing from memory.</li>\n<li>Write capitals exactly as you want them: &#8220;McKenzie&#8221;, not &#8220;mckenzie&#8221;.</li>\n<li>For several personalised items, list the names in the same order as the items in your cart.</li>\n<li>For photo designs, send the original photo file, not a screenshot, and send it the same day.</li>\n<li>Check the shipping address in the order summary before you pay, especially for gifts.</li>\n<li>Look at our <a href=\"/size-guide/\">Size Guide</a> if you are unsure between 11 oz and 15 oz, or 20 oz and 30 oz.</li>\n</ul>\n<p>We print exactly what is in your Order notes and we do not send a proof first, so your reread is the proof. If it helps, read the notes aloud; misspellings are easier to hear than to see.</p>\n<h2>8. Orders placed for a date</h2>\n<p>A change made within 24 hours usually does not delay your order, because we have not printed it yet. A change that needs something from you, such as a new photo or a payment for a price difference, starts processing once we receive it. If your order is for a fixed date, mention the date in your email and we will tell you honestly whether the change affects the timing. Delivery estimates are on the <a href=\"/shipping-delivery/\">Shipping &amp; Delivery</a> page: 1-3 business days of processing and about 7-14 business days in transit.</p>\n<h2>9. Things we cannot change</h2>\n<ul>\n<li>A delivery country outside the United States, Canada, Australia and New Zealand; we do not ship anywhere else.</li>\n<li>An order after it has been printed; that becomes a return instead.</li>\n<li>A change requested by someone other than the buyer, unless the buyer confirms it from the order email address.</li>\n</ul>\n<h2>10. Changes for team, family and holiday orders</h2>\n<p>Larger orders deserve a little extra care, because one wrong line affects several people. Here is how changes work when you are ordering for a group.</p>\n<h3>10.1 Team orders for teachers, nurses or coworkers</h3>\n<p>When you order the same design for several people, such as eight teacher apple mugs for the end of the school year, list each person&#8217;s name and second line in your Order notes in the same order as the mugs appear in your cart. If someone&#8217;s name or title changes within 24 hours, send us the full corrected list rather than a single line; it removes any doubt about which mug is which. If a person drops out of the gift, we can cancel just their mug and refund that item.</p>\n<h3>10.2 Family orders with several names</h3>\n<p>Family name mugs, grandma mugs and Mama est. mugs often carry five or more names. Before you check out, send the list to one other family member to read. Siblings know the spelling of their own children&#8217;s names better than anyone, and a two-minute check saves a reprint. If a correction arrives within the 24-hour window, we update the design before printing.</p>\n<h3>10.3 Holiday orders</h3>\n<p>In the weeks before Christmas, Mother&#8217;s Day and the end of the school year, many orders are placed close to a deadline. A change within 24 hours usually keeps your place in the queue, but a cancellation and a fresh order start the clock again. If timing matters, ask for a change rather than cancelling and reordering.</p>\n<h2>11. What we do with your request</h2>\n<p>When your email arrives, we find the order, pause it if it has not been printed yet, make the change to the design or the order details, and send you a confirmation with the updated information. If the change affects the price, the confirmation explains the difference and how it will be paid or refunded. If we cannot make the change because printing has already started, we tell you straight away and explain your options, including a free return within 60 days of delivery. We never make a change we have not confirmed with you in writing, and we never charge you for a change without telling you first.</p>\n<p>Keep the confirmation email until the parcel arrives. If anything on the delivered mug does not match the confirmed change, it is our error, and we will reprint or refund it.</p>\n<h2>12. A short checklist before you press Place order</h2>\n<ul>\n<li>Is every name spelt the way its owner spells it, with the right capitals?</li>\n<li>Are dates written in the format you want printed, such as 14.02.2021 or February 14, 2021?</li>\n<li>Have you chosen the size and colour you meant, and does the cart show the right quantity?</li>\n<li>For photo designs, do you have the original photo ready to send by replying to your confirmation email?</li>\n<li>Is the shipping address complete, including unit, suite or room number?</li>\n</ul>\n<p>If you can answer yes to all five, the 24-hour window is just a safety net you will probably never need.</p>\n<h2>13. Questions</h2>\n<p>Email <a href=\"mailto:support@mugmellow.shop\">support@mugmellow.shop</a> with your order number and we will help. We reply within 24 hours on business days. You can also find quick answers in our <a href=\"/faqs/\">FAQs</a>, follow a parcel on the <a href=\"/order-tracking/\">Order Tracking</a> page, or browse every support topic in the <a href=\"/help-center/\">Help Center</a>.</p>\n<p>Mug Mellow, 8 Willard Drive, Uxbridge, MA 01569, US.</p>\n","visible_characters":10611,"meta_description":"Fix a misspelt name, swap a photo, change size, colour or address, or cancel your Mug Mellow order free within 24 hours of ordering. Refunds within 7 days.","parent":null,"published_at":"2026-10-30T23:30:51+00:00","updated_at":"2026-10-30T23:30:51+00:00"}}